Lean Foundations & Takt

Read this lesson without an account. To use narrated cards and save your progress in the app, create a free account or sign in. No payment is required for the free modules. Knowledge practice does not replace approved training or any skills evaluation your certifying body requires.

Lean on the Floor

Check this point against current official guidance before relying on it.

  • Lean lives in section I.B — concepts, value streams, and takt time.
  • Eight wastes, one acronym: DOWNTIME.
  • This is floor-walking knowledge: Gemba, flow, pull, perfection.

The Named Concepts

Check this point against current official guidance before relying on it.

  • Theory of constraints: the bottleneck sets throughput.
  • Gemba: go to the real place and watch the actual work.
  • Spaghetti diagram: trace the walking; JIT: make only what's needed, when needed.

Takt Time, Worked

Check this point against current official guidance before relying on it.

  • 480-minute shift, 60 minutes of breaks → 420 available.
  • Demand: 210 units per shift.
  • Takt = 420 ÷ 210 = 2.0 minutes per unit.

DOWNTIME — the 8 Wastes

Check this point against current official guidance before relying on it.

  • Defects, Overproduction, Waiting, Non-utilized talent...
  • ...Transportation, Inventory, Motion, Extra-processing.
  • Transport moves PRODUCT; motion moves PEOPLE.

Quick Self-Check

Check this point against current official guidance before relying on it.

  • In your head:
  • A 450-minute day must produce 150 units — what's the takt?
  • And is a forklift trip transport or motion?